Who is responsible for planning the system design needed for a specific project?

Database Administrator

Graphics Animator

System Analyst

The system analyst plays a crucial role in planning the system design needed for a specific project. This individual is responsible for gathering requirements from stakeholders, analyzing the needs of the users, and creating specifications that will guide the development of the system. The system analyst bridges the gap between the business requirements and the technical team, ensuring that the design aligns with both user needs and technical feasibility.

In contrast, the other roles do not focus primarily on planning system design. A database administrator typically manages and maintains databases and ensures their performance and security, which come into play after the design phase. A graphics animator creates visual content, which is essential for user interfaces and presentations but is not involved in the system’s structural planning. A computer technician deals with the hardware and software maintenance and troubleshooting, rather than the high-level design of new systems. Each of these roles contributes to the overall project but does so from a different perspective that is not focused on system design.

Get further explanation with Examzify DeepDiveBeta

Computer Technician

Next Question

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy